Launch offer: 50% off your first order until 31 December. It comes off at checkout, no code needed.Launch offer: 50% off your first order

Employer and Design Consultant

Combined evaluation report and award recommendation

AED 149
Launch offerAED 74.50 on your first order, until 31 December.
EmployerEmployerinternal
Clause
UAE practice
Time limit
Set by the agreement
Format
Word, 5 pagesExcel, 10 sheetsLanguage: English, plus a full Arabic copy
Stage
Pre-contract: 2. Proposal and awardRoute: Both routes
Procurement routeApplies to the Employer, consultants and Main Contractor

The Employer designs through its consultant, tenders complete drawings and bills, and the contractor builds. FIDIC 1999 Red Book.

What this document does

What you get

  • Report template with sections
  • Excel schedules and summary sheet
  • One-page guide on when and how to use it
  • A full Arabic copy of every file, right to left
  • File: Word, 5 pages
  • File: Excel, 10 sheets
  • Language: English, plus a full Arabic copy
  • Brand-ready: your logo and company details go in when you download
  • Pay once and use it on every project

Save with a pack

Employer to Design Consultant: Proposal and award6 documents. Includes this document.
AED 544AED 349Save AED 195
Main contract tender and award process: Employer steps6 documents. Includes this document.
AED 704AED 489Save AED 215

Where it sits in the processes

Main contract tender and award, step 12 of 14View all
BeforePost-tender clarification response
This documentCombined evaluation report and award recommendation
AfterLetter of award
Supervision appointment and mobilisation, step 7 of 12View all
BeforeTechnical evaluation sheet and report (consultants)
This documentCombined evaluation report and award recommendation
AfterLetter of award

Also used between