Engineer and Main Contractor
AED 850AED 549Save AED 301
Tests after completion procedure and report
AED 129
Launch offerAED 64.50 on your first order, until 31 December.
Main ContractorEngineer
Clause
FIDIC 1999 Yellow BookSub-Clause 12.1
Time limit
Set by the agreement
Format
Word, 6 pagesExcel, 4 sheetsLanguage: English, plus a full Arabic copy
Stage
Post-contract: 7. Handover and closeRoute: Design and Build
What this document does
- Performance test method, measured values against guarantees, retesting and the report that closes the obligation.
- Sent by the Main Contractor to the Engineer.
- Written to FIDIC 1999 Yellow Book, Sub-Clause 12.1.
- For Design and Build projects only.
What you get
- Editable Word template
- Excel schedules and summary sheet
- One-page guide on when and how to use it
- A full Arabic copy of every file, right to left
- File: Word, 6 pages
- File: Excel, 4 sheets
- Language: English, plus a full Arabic copy
- Brand-ready: your logo and company details go in when you download
- Pay once and use it on every project
Save with a pack
Main Contractor to Engineer: Handover and close11 documents. Includes this document.