Launch offer: 50% off your first order until 31 December. It comes off at checkout, no code needed.Launch offer: 50% off your first order

Main Contractor and Supplier

Warranty certificate and spare parts list

AED 59
Launch offerAED 29.50 on your first order, until 31 December.
SupplierMain Contractor
Clause
UAE practice
Time limit
Set by the agreement
Format
Word, 4 pagesLanguage: English, plus a full Arabic copy
Stage
Post-contract: 7. Handover and closeRoute: Both routes. Scope: Supply only, Supply and install, Design, supply and install

What this document does

  • Warranty period, start date, exclusions and the recommended spares with part numbers.
  • Sent by the Supplier to the Main Contractor.
  • Written to UAE practice.
  • Step 14 of 14 in the Specialist equipment procurement process.

What you get

Save with a pack

Specialist equipment procurement process: Supplier steps7 documents. Includes this document.
AED 463AED 319Save AED 144
How to write it

How to write a warranty certificate

A warranty certificate is the supplier’s or subcontractor’s written promise to repair or replace a product or system that fails within a set period. It is handed over with the operation and maintenance manuals at completion, so the building owner can claim directly. The spare parts list tells the owner which parts to keep in stock.

What to include

  1. 1The product or system, its make and model, and where it is installed
  2. 2The warranty period, its start date and its end date
  3. 3What is covered: materials, workmanship and, where the supplier designed it, the design
  4. 4How fast the supplier responds to a claim, with a shorter time for urgent faults
  5. 5The exclusions, such as misuse and maintenance not done as the manual requires
  6. 6Who receives defect notices, and that the warranty passes to later owners
  7. 7The recommended spare parts, with part numbers, quantities and lead times

When to use it

At handover, with the operation and maintenance manuals. Match the start date to the contract: usually the date of taking over, not the date of delivery, so the warranty does not run out before the owner uses the building.

Read the full guideHandover in construction: snag list, taking over and the defects period
Sample wording
We warrant that the chilled water pumps we supplied and installed in the Basement 1 plant room of the Project are free from defects in materials and workmanship for 24 months from 30 September 2026, the date of taking over. We will start repairs within 3 days of written notice, or within 24 hours where a fault affects use or safety.

Common mistakes

  • A start date before taking over, so part of the warranty is used up before the owner moves in
  • No response time, so a claim can wait for weeks
  • Exclusions so wide that almost any fault is excluded
  • A warranty that cannot pass to the building owner or a later owner

Questions people ask

When should the warranty start?

Usually on the date the Works are taken over, because the owner uses the system from then. If a supplier insists on the delivery date, extend the period to cover the time between delivery and handover.

Does the warranty replace the defects notification period?

No, it adds to it. During the defects notification period the contractor remedies defects under the contract (Clause 11 of FIDIC). A longer product warranty protects the owner after that period ends.

Where it sits in the processes

Specialist equipment procurement, step 14 of 14View all
BeforeInstallation supervision and commissioning report (vendor)
This documentWarranty certificate and spare parts list
End of the process

Also used between