Launch offer: 50% off your first order until 31 December. It comes off at checkout, no code needed.Launch offer: 50% off your first order

Main Contractor and Subcontractor

Waterproofing membrane inspection and flood test record

AED 49
Launch offerAED 24.50 on your first order, until 31 December.
SubcontractorMain Contractor
Clause
FIDIC 1999 Red BookSub-Clause 7.3
Time limit
Set by the agreement
Format
Excel, 4 sheetsLanguage: English, plus a full Arabic copy
Stage
Post-contract: 4. Build and monitorRoute: Both routes. Trade: Roofing and waterproofing

What this document does

  • Substrate, laps, upstands and protection checked, with the 24 or 48 hour flood test result.
  • Sent by the Subcontractor to the Main Contractor.
  • Written to FIDIC 1999 Red Book, Sub-Clause 7.3.
  • Written for: Roofing and waterproofing.

What you get

Save with a pack

Subcontractor to Main Contractor: Build and monitor, Roofing and waterproofing16 documents. Includes this document.
AED 1,126AED 729Save AED 397

Also used between