Launch offer: 50% off your first order until 31 December. It comes off at checkout, no code needed.Launch offer: 50% off your first order

Main Contractor and Design Consultant

Contractor’s design brief to its designer

AED 99
Launch offerAED 49.50 on your first order, until 31 December.
Main ContractorDesign Consultant
Clause
FIDIC 1999 Yellow BookSub-Clause 5.1
Time limit
Set by the agreement
Format
Word, 8 pagesLanguage: English, plus a full Arabic copy
Stage
Pre-contract: 1. Request for proposalRoute: Design and Build

What this document does

  • Turns the Employer’s Requirements and the Contractor’s Proposals into the designer’s instructions, scope and deliverables.
  • Sent by the Main Contractor to the Design Consultant.
  • Written to FIDIC 1999 Yellow Book, Sub-Clause 5.1.
  • Step 1 of 8 in the Design submissions under Design and Build process.
  • For Design and Build projects only.

What you get

Save with a pack

Design submissions under Design and Build process: Main Contractor steps6 documents. Includes this document.
AED 464AED 319Save AED 145

Where it sits in the processes

Design submissions under Design and Build, step 1 of 8View all
Start of the process
This documentContractor’s design brief to its designer
AfterDesigner deliverables schedule and review log