Design submissions under Design and Build
The contractor’s designer produces, the contractor submits, the Engineer reviews within 21 days and gives or withholds a no-objection.
Show steps for
8 steps in this process
4Contractor’s Documents submission (design submission) Main Contractor Engineer
YB 5.2 Review period of 21 days from receipt
AED 99
5Review notice and no-objection letter Engineer Main Contractor
YB 5.2 Within the 21-day review period; with no notice, the document is deemed approved
AED 59
8Designer’s compliance certificate for construction issue (Design and Build) Main Contractor Engineer
YB 5.2
AED 49