Main Contractor and Design Consultant
Designer deliverables schedule and review log
Design ConsultantMain Contractor
Clause
FIDIC 1999 Yellow BookSub-Clause 5.2
Time limit
Set by the agreement
Format
ExcelLanguage: English
Stage
Post-contract: 6. Detailed design and approvalsRoute: Design and Build
What this document does
- Packages, dates, submission status and Engineer review outcomes for every design deliverable.
- Sent by the Design Consultant to the Main Contractor.
- Written to FIDIC 1999 Yellow Book, Sub-Clause 5.2.
- Step 2 of 8 in the Design submissions under Design and Build process.
- For Design and Build projects only.
What you get
- Excel register with automatic totals
- One-page guide on when and how to use it
- File: Excel
- Language: English
- Brand-ready: your logo and company details go in when you download
- Pay once and use it on every project
Where it sits in the processes
Design submissions under Design and Build, step 2 of 8View all
BeforeContractor’s design brief to its designer
This documentDesigner deliverables schedule and review log
AfterContractor’s Documents submission schedule