Main Contractor and Design Consultant

Designer deliverables schedule and review log

Design ConsultantMain Contractor
Clause
FIDIC 1999 Yellow BookSub-Clause 5.2
Time limit
Set by the agreement
Format
ExcelLanguage: English
Stage
Post-contract: 6. Detailed design and approvalsRoute: Design and Build

What this document does

  • Packages, dates, submission status and Engineer review outcomes for every design deliverable.
  • Sent by the Design Consultant to the Main Contractor.
  • Written to FIDIC 1999 Yellow Book, Sub-Clause 5.2.
  • Step 2 of 8 in the Design submissions under Design and Build process.
  • For Design and Build projects only.