Engineer and Main Contractor
Claim deadline calculatorEnter the date you became aware of the event and we email you 7 days before the notice and the fully detailed claim are due.
AED 1,126AED 729Save AED 397
Early warning notice
AED 39
Launch offerAED 19.50 on your first order, until 31 December.
Main ContractorEngineer
Clause
FIDIC 1999 Red BookSub-Clause 8.3
Time limit
Promptly, when a probable future event may delay or disrupt the works
Format
Word, 4 pagesLanguage: English, plus a full Arabic copy
Stage
Post-contract: 4. Build and monitorRoute: Both routes
What this document does
- Gives advance notice of a probable event affecting time, cost or quality so it can be managed together.
- Sent by the Main Contractor to the Engineer.
- Written to FIDIC 1999 Red Book, Sub-Clause 8.3.
- Time limit: Promptly, when a probable future event may delay or disrupt the works.
- Step 1 of 10 in the Delay and extension of time process.
What you get
- Editable Word template
- One-page guide on when and how to use it
- A full Arabic copy of every file, right to left
- File: Word, 4 pages
- Language: English, plus a full Arabic copy
- Brand-ready: your logo and company details go in when you download
- Pay once and use it on every project
Save with a pack
Main Contractor to Engineer: Build and monitor16 documents. Includes this document.
Where it sits in the processes
Delay and extension of time, step 1 of 10View all