Subcontractor notice of delay and claim
AED 59
Launch offerAED 29.50 on your first order, until 31 December.
SubcontractorMain Contractor
Clause
FIDIC Conditions of Subcontract 2011Sub-Clause 20.2
Time limit
Within 21 days of awareness, so the main contractor can notify within its own 28 days
Format
Word, 5 pagesLanguage: English, plus a full Arabic copy
Stage
Post-contract: 5. Changes and claimsRoute: Both routes
What this document does
- Notifies delay or extra cost under the subcontract within the shorter time bar.
- Sent by the Subcontractor to the Main Contractor.
- Written to FIDIC Conditions of Subcontract 2011, Sub-Clause 20.2.
- Time limit: Within 21 days of awareness, so the main contractor can notify within its own 28 days.
- Goes with: Subcontract extension of time grant or rejection
- Step 2 of 10 in the Delay and extension of time process.
What you get
- Editable Word template
- Time-limit reminder table
- One-page guide on when and how to use it
- A full Arabic copy of every file, right to left
- File: Word, 5 pages
- Language: English, plus a full Arabic copy
- Brand-ready: your logo and company details go in when you download
- Pay once and use it on every project
Save with a pack
Subcontractor to Main Contractor: Changes and claims3 documents. Includes this document.
Delay and extension of time process: Subcontractor steps2 documents. Includes this document.
Where it sits in the processes
Delay and extension of time, step 2 of 10View all