Engineer and Main Contractor
AED 454AED 299Save AED 155
AED 346AED 239Save AED 107
Engineer’s request for variation proposal
AED 39
Launch offerAED 19.50 on your first order, until 31 December.
EngineerMain Contractor
Clause
FIDIC 1999 Red BookSub-Clause 13.3
Time limit
Set by the agreement
Format
Word, 3 pagesLanguage: English, plus a full Arabic copy
Stage
Post-contract: 5. Changes and claimsRoute: Both routes
What this document does
- Asks the contractor to submit a proposal before a variation is instructed.
- Sent by the Engineer to the Main Contractor.
- Written to FIDIC 1999 Red Book, Sub-Clause 13.3.
- Goes with: Variation proposal with cost and time breakdown
- Step 4 of 10 in the Variation process.
What you get
- Editable Word template
- One-page guide on when and how to use it
- A full Arabic copy of every file, right to left
- File: Word, 3 pages
- Language: English, plus a full Arabic copy
- Brand-ready: your logo and company details go in when you download
- Pay once and use it on every project
Save with a pack
Engineer to Main Contractor: Changes and claims6 documents. Includes this document.
Variation process: Supervision Consultant steps4 documents. Includes this document.
Where it sits in the processes
Variation, step 4 of 10View all
BeforeNotice of variation and request for instruction
This documentEngineer’s request for variation proposal
AfterVariation proposal with cost and time breakdown