Engineer and Main Contractor
AED 654AED 429Save AED 225
AED 207AED 139Save AED 68
Variation proposal with cost and time breakdown
AED 99
Launch offerAED 49.50 on your first order, until 31 December.
Main ContractorEngineer
Clause
FIDIC 1999 Red BookSub-Clause 13.3
Time limit
As soon as practicable after the request; particular conditions often set 14 days
Format
Word, 5 pagesExcel, 5 sheetsLanguage: English, plus a full Arabic copy
Stage
Post-contract: 5. Changes and claimsRoute: Both routes
What this document does
- Description of the work, programme effect and a priced breakdown at contract rates or dayworks.
- Sent by the Main Contractor to the Engineer.
- Written to FIDIC 1999 Red Book, Sub-Clause 13.3.
- Time limit: As soon as practicable after the request; particular conditions often set 14 days.
- Goes with: Variation order
- Step 5 of 10 in the Variation process.
What you get
- Editable Word template
- Excel schedules and summary sheet
- Worked example
- One-page guide on when and how to use it
- A full Arabic copy of every file, right to left
- File: Word, 5 pages
- File: Excel, 5 sheets
- Language: English, plus a full Arabic copy
- Brand-ready: your logo and company details go in when you download
- Pay once and use it on every project
Save with a pack
Main Contractor to Engineer: Changes and claims6 documents. Includes this document.
Variation process: Main Contractor steps3 documents. Includes this document.
Where it sits in the processes
Variation, step 5 of 10View all
BeforeEngineer’s request for variation proposal
This documentVariation proposal with cost and time breakdown
AfterVariation register with estimates and approved values