Launch offer: 50% off your first order until 31 December. It comes off at checkout, no code needed.Launch offer: 50% off your first order

Engineer and Main Contractor

Variation proposal with cost and time breakdown

AED 99
Launch offerAED 49.50 on your first order, until 31 December.
Main ContractorEngineer
Clause
FIDIC 1999 Red BookSub-Clause 13.3
Time limit
As soon as practicable after the request; particular conditions often set 14 days
Format
Word, 5 pagesExcel, 5 sheetsLanguage: English, plus a full Arabic copy
Stage
Post-contract: 5. Changes and claimsRoute: Both routes
Procurement routeApplies to the Employer, consultants and Main Contractor

The Employer designs through its consultant, tenders complete drawings and bills, and the contractor builds. FIDIC 1999 Red Book.

What this document does

  • Description of the work, programme effect and a priced breakdown at contract rates or dayworks.
  • Sent by the Main Contractor to the Engineer.
  • Written to FIDIC 1999 Red Book, Sub-Clause 13.3.
  • Time limit: As soon as practicable after the request; particular conditions often set 14 days.
  • Goes with: Variation order
  • Step 5 of 10 in the Variation process.

What you get

  • Editable Word template
  • Excel schedules and summary sheet
  • Worked example
  • One-page guide on when and how to use it
  • A full Arabic copy of every file, right to left
  • File: Word, 5 pages
  • File: Excel, 5 sheets
  • Language: English, plus a full Arabic copy
  • Brand-ready: your logo and company details go in when you download
  • Pay once and use it on every project

Save with a pack

Main Contractor to Engineer: Changes and claims6 documents. Includes this document.
AED 654AED 429Save AED 225
Variation process: Main Contractor steps3 documents. Includes this document.
AED 207AED 139Save AED 68

Where it sits in the processes

Variation, step 5 of 10View all