Engineer and Main Contractor

Engineer’s response to notice and request for particulars

AED 49
Launch offerAED 24.50 on your first order, until 31 December.
EngineerMain Contractor
Clause
FIDIC 1999 Red BookSub-Clause 20.1
Time limit
Set by the agreement
Format
Word, 4 pagesLanguage: English, plus a full Arabic copy
Stage
Post-contract: 5. Changes and claimsRoute: Both routes
Procurement routeApplies to the Employer, consultants and Main Contractor

The Employer designs through its consultant, tenders complete drawings and bills, and the contractor builds. FIDIC 1999 Red Book.

Claim deadline calculatorEnter the date you became aware of the event and we email you 7 days before the notice and the fully detailed claim are due.

What this document does

  • Accepts or disputes the notice and sets out the records and particulars required.
  • Sent by the Engineer to the Main Contractor.
  • Written to FIDIC 1999 Red Book, Sub-Clause 20.1.
  • Goes with: Notice of claim
  • Step 4 of 10 in the Delay and extension of time process.

What you get

Save with a pack

Engineer to Main Contractor: Changes and claims6 documents. Includes this document.
AED 454AED 299Save AED 155
Delay and extension of time process: Supervision Consultant steps3 documents. Includes this document.
AED 207AED 139Save AED 68

Where it sits in the processes

Delay and extension of time, step 4 of 10View all
BeforeNotice of claim
This documentEngineer’s response to notice and request for particulars
AfterContemporary records pack and delay event log