Engineer and Main Contractor
Claim deadline calculatorEnter the date you became aware of the event and we email you 7 days before the notice and the fully detailed claim are due.
AED 454AED 299Save AED 155
AED 207AED 139Save AED 68
Engineer’s response to notice and request for particulars
AED 49
Launch offerAED 24.50 on your first order, until 31 December.
EngineerMain Contractor
Clause
FIDIC 1999 Red BookSub-Clause 20.1
Time limit
Set by the agreement
Format
Word, 4 pagesLanguage: English, plus a full Arabic copy
Stage
Post-contract: 5. Changes and claimsRoute: Both routes
What this document does
- Accepts or disputes the notice and sets out the records and particulars required.
- Sent by the Engineer to the Main Contractor.
- Written to FIDIC 1999 Red Book, Sub-Clause 20.1.
- Goes with: Notice of claim
- Step 4 of 10 in the Delay and extension of time process.
What you get
- Editable Word template
- One-page guide on when and how to use it
- A full Arabic copy of every file, right to left
- File: Word, 4 pages
- Language: English, plus a full Arabic copy
- Brand-ready: your logo and company details go in when you download
- Pay once and use it on every project
Save with a pack
Engineer to Main Contractor: Changes and claims6 documents. Includes this document.
Delay and extension of time process: Supervision Consultant steps3 documents. Includes this document.
Where it sits in the processes
Delay and extension of time, step 4 of 10View all
BeforeNotice of claim
This documentEngineer’s response to notice and request for particulars
AfterContemporary records pack and delay event log