Launch offer: 50% off your first order until 31 December. It comes off at checkout, no code needed.Launch offer: 50% off your first order

Engineer and Main Contractor

Contemporary records pack and delay event log

AED 99
Launch offerAED 49.50 on your first order, until 31 December.
Main ContractorEngineer
Clause
FIDIC 1999 Red BookSub-Clause 20.1
Time limit
Set by the agreement
Format
Excel, 5 sheetsLanguage: English, plus a full Arabic copy
Stage
Post-contract: 5. Changes and claimsRoute: Both routes
Procurement routeApplies to the Employer, consultants and Main Contractor

The Employer designs through its consultant, tenders complete drawings and bills, and the contractor builds. FIDIC 1999 Red Book.

Claim deadline calculatorEnter the date you became aware of the event and we email you 7 days before the notice and the fully detailed claim are due.

What this document does

  • Daily records, photographs, instructions and correspondence organised by delay event.
  • Sent by the Main Contractor to the Engineer.
  • Written to FIDIC 1999 Red Book, Sub-Clause 20.1.
  • Step 5 of 10 in the Delay and extension of time process.

What you get

Save with a pack

Main Contractor to Engineer: Changes and claims6 documents. Includes this document.
AED 654AED 429Save AED 225
Delay and extension of time process: Main Contractor steps4 documents. Includes this document.
AED 456AED 319Save AED 137

Where it sits in the processes

Delay and extension of time, step 5 of 10View all