Contemporary records pack and delay event log
AED 99
Launch offerAED 49.50 on your first order, until 31 December.
Main ContractorEngineer
Clause
FIDIC 1999 Red BookSub-Clause 20.1
Time limit
Set by the agreement
Format
Excel, 5 sheetsLanguage: English, plus a full Arabic copy
Stage
Post-contract: 5. Changes and claimsRoute: Both routes
What this document does
- Daily records, photographs, instructions and correspondence organised by delay event.
- Sent by the Main Contractor to the Engineer.
- Written to FIDIC 1999 Red Book, Sub-Clause 20.1.
- Step 5 of 10 in the Delay and extension of time process.
What you get
- Excel register with automatic totals
- Checklist of attachments
- One-page guide on when and how to use it
- A full Arabic copy of every file, right to left
- File: Excel, 5 sheets
- Language: English, plus a full Arabic copy
- Brand-ready: your logo and company details go in when you download
- Pay once and use it on every project
Save with a pack
Main Contractor to Engineer: Changes and claims6 documents. Includes this document.
Delay and extension of time process: Main Contractor steps4 documents. Includes this document.
Where it sits in the processes
Delay and extension of time, step 5 of 10View all
BeforeEngineer’s response to notice and request for particulars
This documentContemporary records pack and delay event log
AfterFully detailed extension of time and prolongation claim