Engineer and Main Contractor
AED 622AED 399Save AED 223
AED 495AED 349Save AED 146
Handover strategy and documentation plan
AED 99
Launch offerAED 49.50 on your first order, until 31 December.
Main ContractorEngineer
Clause
FIDIC 1999 Red BookSub-Clause 4.1
Time limit
Commonly required six months before completion
Format
Word, 12 pagesLanguage: English, plus a full Arabic copy
Stage
Post-contract: 7. Handover and closeRoute: Both routes
What this document does
- Who hands over what, when, in what format, with the testing, training and authority approvals sequenced.
- Sent by the Main Contractor to the Engineer.
- Written to FIDIC 1999 Red Book, Sub-Clause 4.1.
- Time limit: Commonly required six months before completion.
- Step 2 of 14 in the Handover, defects and close-out process.
What you get
- Editable Word template
- Excel schedules and summary sheet
- One-page guide on when and how to use it
- A full Arabic copy of every file, right to left
- File: Word, 12 pages
- Language: English, plus a full Arabic copy
- Brand-ready: your logo and company details go in when you download
- Pay once and use it on every project
Save with a pack
Main Contractor to Engineer: Handover and close9 documents. Includes this document.
Handover, defects and close-out process: Main Contractor steps6 documents. Includes this document.
Where it sits in the processes
Handover, defects and close-out, step 2 of 14View all
BeforeSubcontract completion notice and handover
This documentHandover strategy and documentation plan
AfterTesting and commissioning method statement and report