Launch offer: 50% off your first order until 31 December. It comes off at checkout, no code needed.Launch offer: 50% off your first order

Engineer and Main Contractor

Handover strategy and documentation plan

AED 99
Launch offerAED 49.50 on your first order, until 31 December.
Main ContractorEngineer
Clause
FIDIC 1999 Red BookSub-Clause 4.1
Time limit
Commonly required six months before completion
Format
Word, 12 pagesLanguage: English, plus a full Arabic copy
Stage
Post-contract: 7. Handover and closeRoute: Both routes
Procurement routeApplies to the Employer, consultants and Main Contractor

The Employer designs through its consultant, tenders complete drawings and bills, and the contractor builds. FIDIC 1999 Red Book.

What this document does

  • Who hands over what, when, in what format, with the testing, training and authority approvals sequenced.
  • Sent by the Main Contractor to the Engineer.
  • Written to FIDIC 1999 Red Book, Sub-Clause 4.1.
  • Time limit: Commonly required six months before completion.
  • Step 2 of 14 in the Handover, defects and close-out process.

What you get

Save with a pack

Main Contractor to Engineer: Handover and close9 documents. Includes this document.
AED 622AED 399Save AED 223
Handover, defects and close-out process: Main Contractor steps6 documents. Includes this document.
AED 495AED 349Save AED 146

Where it sits in the processes

Handover, defects and close-out, step 2 of 14View all