Material inspection request on delivery
AED 49
Launch offerAED 24.50 on your first order, until 31 December.
Main ContractorEngineer
Clause
FIDIC 1999 Red BookSub-Clause 7.3
Time limit
Set by the agreement
Format
Excel, 4 sheetsLanguage: English, plus a full Arabic copy
Stage
Post-contract: 4. Build and monitorRoute: Both routes. Scope: Supply only, Supply and install, Design, supply and install
What this document does
- Offers delivered materials for inspection against the approved submittal before they are used.
- Sent by the Main Contractor to the Engineer.
- Written to FIDIC 1999 Red Book, Sub-Clause 7.3.
- Step 6 of 6 in the Inspection and quality process.
What you get
- Fillable form
- Log with status and ageing
- A full Arabic copy of every file, right to left
- File: Excel, 4 sheets
- Language: English, plus a full Arabic copy
- Brand-ready: your logo and company details go in when you download
- Pay once and use it on every project
Save with a pack
Main Contractor to Engineer: Build and monitor16 documents. Includes this document.
Inspection and quality process: Main Contractor steps3 documents. Includes this document.