Engineer and Main Contractor

Site observation report

EngineerMain Contractor
Clause
FIDIC 1999 Red BookSub-Clause 7.3
Time limit
Set by the agreement
Format
WordLanguage: English
Stage
Post-contract: 4. Build and monitorRoute: Both routes
Procurement routeApplies to the Employer, consultants and Main Contractor

The Employer designs through its consultant, tenders complete drawings and bills, and the contractor builds. FIDIC 1999 Red Book.

What this document does

  • Records observations on quality or safety that do not yet warrant a non-conformance report.
  • Sent by the Engineer to the Main Contractor.
  • Written to FIDIC 1999 Red Book, Sub-Clause 7.3.
  • Step 5 of 6 in the Inspection and quality process.

What you get

Where it sits in the processes

Inspection and quality, step 5 of 6View all