Engineer and Main Contractor

Non-conformance report and log

AED 79
Launch offerAED 39.50 on your first order, until 31 December.
EngineerMain Contractor
Clause
FIDIC 1999 Red BookSub-Clause 7.5
Time limit
Set by the agreement
Format
Excel, 4 sheetsLanguage: English, plus a full Arabic copy
Stage
Post-contract: 4. Build and monitorRoute: Both routes
Procurement routeApplies to the Employer, consultants and Main Contractor

The Employer designs through its consultant, tenders complete drawings and bills, and the contractor builds. FIDIC 1999 Red Book.

What this document does

  • Records the defect, the corrective and preventive action and the close-out, with a log for audit.
  • Sent by the Engineer to the Main Contractor.
  • Written to FIDIC 1999 Red Book, Sub-Clause 7.5.
  • Step 3 of 6 in the Inspection and quality process.

What you get

Save with a pack

Engineer to Main Contractor: Build and monitor7 documents. Includes this document.
AED 315AED 199Save AED 116
Inspection and quality process: Supervision Consultant steps2 documents. Includes this document.
AED 79AED 59Save AED 20
How to write it

How to write a non-conformance report (NCR)

An NCR records work, Plant or Materials that do not comply with the contract, the action to correct them and the close-out. Under Sub-Clause 7.5 of the FIDIC 1999 Red Book the Engineer may reject them with reasons, and the Contractor then makes good the defect.

What to include

  1. 1The NCR number, date, location and discipline
  2. 2What does not comply, with photographs
  3. 3The requirement it breaks: drawing, specification clause or standard
  4. 4Whether the work must stop, and how serious it is
  5. 5The Contractor’s correction, the root cause and the preventive action
  6. 6Re-inspection and close-out, with signatures and the date

When to use it

As soon as the non-compliance is found, at an inspection, a test or a review. Close it only after the corrected work has been inspected again.

Read the full guideSite inspections in construction: the ITP, inspection requests and NCRs
Sample wording
NCR-031, Finishes. Gypsum ceiling boards on Level 6, rooms 601 to 608, are fixed at 600 mm centres instead of the 400 mm required by specification Section 09 21 16, clause 3.4. Work to stop in the affected rooms. The Contractor is to remove and refix the boards and propose a preventive action by 22 August 2026.

Common mistakes

  • Describing the defect without the requirement it breaks
  • Closing an NCR on a promise instead of a re-inspection
  • No root cause, so the same defect comes back

Questions people ask

Who issues an NCR?

Usually the Engineer or the Contractor’s own quality team, and a main contractor also raises them on its subcontractors. The steps are the same: record, correct, inspect again and close.

Who pays for retesting?

Under Sub-Clause 7.5, where the rejection and retesting cause the Employer additional costs, the Contractor pays them, subject to Sub-Clause 2.5.