Non-conformance report and log
EngineerMain Contractor
Clause
FIDIC 1999 Red BookSub-Clause 7.5
Time limit
Set by the agreement
Format
ExcelLanguage: English
Stage
Post-contract: 4. Build and monitorRoute: Both routes
What this document does
- Records the defect, the corrective and preventive action and the close-out, with a log for audit.
- Sent by the Engineer to the Main Contractor.
- Written to FIDIC 1999 Red Book, Sub-Clause 7.5.
- Step 3 of 6 in the Inspection and quality process.
What you get
- Fillable form
- Log with status and ageing
- One-page guide on when and how to use it
- File: Excel
- Language: English
- Brand-ready: your logo and company details go in when you download
- Pay once and use it on every project