O&M manual structure and as-built index
What this document does
- Section structure, system data sheets, maintenance schedules and the as-built drawing index reviewers expect.
- Sent by the Main Contractor to the Engineer.
- Written to UAE practice.
What you get
- Editable Word template
- Checklist of attachments
- One-page guide on when and how to use it
- A full Arabic copy of every file, right to left
- File: Word, 7 pages
- Language: English, plus a full Arabic copy
- Brand-ready: your logo and company details go in when you download
- Pay once and use it on every project
Save with a pack
Free basic version or the full version
Basic version
- The English Word form, 7 pages
- No payment and no sign-up
- A line in the footer: Free basic version from builderdraft.com
AED 99
- The same Word form, with no line in the footer
- One-page guide on when and how to use it
- Your logo and company details on every file
How to put together an O&M manual
The operation and maintenance manual lets the Employer and the facilities team run, maintain and repair the building after handover. Under Sub-Clause 4.1 of the FIDIC 1999 Red Book, for any part the Contractor designed, the as-built documents and O&M manuals are submitted before the Tests on Completion, and that part is not complete for taking over until they are. Most specifications ask the same for every system.
What to include
- 1A master index and a building user guide, with the emergency contacts
- 2One volume per system, from architecture and structure to fire, electrical, building management and lifts
- 3For each system: its description, operation, planned maintenance, equipment data sheets and test records
- 4Warranties in the Employer’s name, the spare parts handed over and the special tools
- 5Health and safety: residual risks, hazardous materials and isolation points
- 6The as-built drawing index by discipline, with the drawings or the files
When to use it
Agree the structure early, collect the content system by system during installation and commissioning, and submit a draft for review well before completion. The final, reviewed copies go in before taking over.
Volume 3, Cooling and ventilation, Rev 1. Chapter 5, Equipment data: AHU-04, make and model as approved under MAR-118, serial number, location Level 2 plant room, rated airflow 6,500 l/s, supplier, and warranty expiry 30 November 2028. Manufacturer’s literature for the installed model only, with the model marked.
Common mistakes
- Filling the manual with whole product catalogues instead of the installed models
- Giving set points and schedules as designed, not as commissioned
- Submitting it at the last minute, so taking over waits for the review
Questions people ask
What is the difference between the O&M manual and the as-built drawings?
The as-built drawings show what was built and where. The O&M manual explains how to run and maintain it. The manual carries the as-built drawing index, so the facilities team finds both in one place.
Who writes each volume?
The trade that installed the system writes its volume. The Contractor compiles and checks the whole manual and submits it with one index and one format.