Engineer and Main Contractor
Performance certificate
EngineerMain Contractor
Clause
FIDIC 1999 Red BookSub-Clause 11.9
Time limit
Within 28 days of the latest expiry of the defects notification periods
Format
WordLanguage: English and Arabic
Stage
Post-contract: 7. Handover and closeRoute: Both routes
What this document does
- The only certificate that constitutes acceptance of the works; releases the performance security and the second half of retention.
- Sent by the Engineer to the Main Contractor.
- Written to FIDIC 1999 Red Book, Sub-Clause 11.9.
- Time limit: Within 28 days of the latest expiry of the defects notification periods.
- Goes with: Request for performance certificate
- Step 13 of 14 in the Handover, defects and close-out process.
What you get
- Fillable form
- English and Arabic text side by side
- One-page guide on when and how to use it
- File: Word
- Language: English and Arabic
- Brand-ready: your logo and company details go in when you download
- Pay once and use it on every project
Where it sits in the processes
Handover, defects and close-out, step 13 of 14View all
BeforeRequest for performance certificate
This documentPerformance certificate
AfterFinal statement and discharge