Engineer and Main Contractor
AED 334AED 219Save AED 115
AED 285AED 199Save AED 86
Performance certificate
AED 59
Launch offerAED 29.50 on your first order, until 31 December.
EngineerMain Contractor
Clause
FIDIC 1999 Red BookSub-Clause 11.9
Time limit
Within 28 days of the latest expiry of the defects notification periods
Format
Word, 2 pagesEnglish and Arabic copy, 2 pages
Stage
Post-contract: 7. Handover and closeRoute: Both routes
What this document does
- The only certificate that constitutes acceptance of the works; releases the performance security and the second half of retention.
- Sent by the Engineer to the Main Contractor.
- Written to FIDIC 1999 Red Book, Sub-Clause 11.9.
- Time limit: Within 28 days of the latest expiry of the defects notification periods.
- Goes with: Request for performance certificate
- Step 13 of 14 in the Handover, defects and close-out process.
What you get
- Fillable form
- An English copy, and a copy with English and Arabic side by side
- One-page guide on when and how to use it
- File: Word, 2 pages
- File: English and Arabic copy, 2 pages
- Brand-ready: your logo and company details go in when you download
- Pay once and use it on every project
Save with a pack
Engineer to Main Contractor: Handover and close6 documents. Includes this document.
Handover, defects and close-out process: Supervision Consultant steps5 documents. Includes this document.
Where it sits in the processes
Handover, defects and close-out, step 13 of 14View all
BeforeRequest for performance certificate
This documentPerformance certificate
AfterFinal statement and discharge