Engineer and Main Contractor
AED 594AED 389Save AED 205
AED 535AED 369Save AED 166
Final statement and discharge
AED 149
Launch offerAED 74.50 on your first order, until 31 December.
Main ContractorEngineer
Clause
FIDIC 1999 Red BookSub-Clause 14.11
Time limit
Draft final statement within 56 days of receiving the Performance Certificate
Format
Word, 6 pagesExcel, 9 sheetsLanguage: English, plus a full Arabic copy
Stage
Post-contract: 6. PaymentsRoute: Both routes
What this document does
- Draft and agreed final statement with the written discharge that confirms full and final settlement.
- Sent by the Main Contractor to the Engineer.
- Written to FIDIC 1999 Red Book, Sub-Clause 14.11.
- Time limit: Draft final statement within 56 days of receiving the Performance Certificate.
- Step 9 of 9 in the Payment process.
- Step 14 of 14 in the Handover, defects and close-out process.
What you get
- Excel schedules and summary sheet
- Editable Word template
- One-page guide on when and how to use it
- A full Arabic copy of every file, right to left
- File: Word, 6 pages
- File: Excel, 9 sheets
- Language: English, plus a full Arabic copy
- Brand-ready: your logo and company details go in when you download
- Pay once and use it on every project
Save with a pack
Main Contractor to Engineer: Payments6 documents. Includes this document.
Payment process: Main Contractor steps5 documents. Includes this document.