Engineer and Main Contractor

Final statement and discharge

AED 149
Launch offerAED 74.50 on your first order, until 31 December.
Main ContractorEngineer
Clause
FIDIC 1999 Red BookSub-Clause 14.11
Time limit
Draft final statement within 56 days of receiving the Performance Certificate
Format
Word, 6 pagesExcel, 9 sheetsLanguage: English, plus a full Arabic copy
Stage
Post-contract: 6. PaymentsRoute: Both routes
Procurement routeApplies to the Employer, consultants and Main Contractor

The Employer designs through its consultant, tenders complete drawings and bills, and the contractor builds. FIDIC 1999 Red Book.

What this document does

  • Draft and agreed final statement with the written discharge that confirms full and final settlement.
  • Sent by the Main Contractor to the Engineer.
  • Written to FIDIC 1999 Red Book, Sub-Clause 14.11.
  • Time limit: Draft final statement within 56 days of receiving the Performance Certificate.
  • Step 9 of 9 in the Payment process.
  • Step 14 of 14 in the Handover, defects and close-out process.

What you get

Save with a pack

Main Contractor to Engineer: Payments6 documents. Includes this document.
AED 594AED 389Save AED 205
Payment process: Main Contractor steps5 documents. Includes this document.
AED 535AED 369Save AED 166

Where it sits in the processes

Payment, step 9 of 9View all
BeforeStatement at completion
This documentFinal statement and discharge
End of the process
Handover, defects and close-out, step 14 of 14View all
BeforePerformance certificate
This documentFinal statement and discharge
End of the process