Reinforcement and formwork inspection checklist
What this document does
- Bar size, spacing, cover, laps, formwork line and level and embedded items, signed before the pour.
- Sent by the Subcontractor to the Main Contractor.
- Written to FIDIC 1999 Red Book, Sub-Clause 7.3.
- Written for: Concrete structure.
What you get
- Fillable form
- Checklist of attachments
- A full Arabic copy of every file, right to left
- File: Excel, 3 sheets
- Language: English, plus a full Arabic copy
- Brand-ready: your logo and company details go in when you download
- Pay once and use it on every project
Save with a pack
How to inspect reinforcement and formwork before a pour
The reinforcement and formwork check is the last chance to see the steel before it disappears into the concrete. Under Sub-Clause 7.3 of the FIDIC 1999 Red Book the Contractor gives notice when work is ready and before it is covered, and the Engineer inspects it or says that no inspection is needed. The checklist records your own check first, then the MEP sign-off and the Engineer’s inspection, element by element.
What to include
- 1The element, its location by level and grids, and the drawing and bar schedule revisions
- 2Formwork: line, level and dimensions, props and bracing, tight joints and clean, oiled faces
- 3Reinforcement: bar sizes and numbers, spacing, cover and spacers, laps, anchorage and starter bars
- 4Embedded items: sleeves, conduits, cast-in plates and water stops, signed off by the MEP trades
- 5Ready to pour: area clean, access and pump position, and the concrete order confirmed
- 6Signatures of the site engineer, the MEP trades and the Engineer, with the inspection request number
When to use it
Once the steel is fixed and the MEP trades have finished, before you raise the inspection request. Pour only after the Engineer has inspected the work or confirmed in writing that no inspection is needed.
RC-118, Level 4 slab, grids 7 to 12 and C to H, to drawing S-404 Rev B and bar schedule BS-404 Rev A. Cover checked across the slab and at the edges, with spacers at 1 m centres; laps as detail 6; sleeves and conduits signed off by the MEP trades. Ready for inspection under IR-342 on 18 November 2026 at 07:30, with 85 m³ of 40 MPa concrete planned for 13:00 subject to release.
Common mistakes
- Measuring the cover at one point only, when it is most often short at the edges and corners
- Pouring before the MEP trades sign off, then coring through new concrete for a missed sleeve
- Confirming the concrete order before the inspection is passed
Questions people ask
What cover should I check against?
The cover on the drawings or in the Specification for each element and exposure class. Check the spacer size against it, and measure at the edges and corners as well as in the middle.
Do I need a checklist for each pour?
Yes. Use one checklist per element or pour, with its own inspection request number, so each pour links to its inspection and to the cube results on its pour card.