Launch offer: 50% off your first order until 31 December. It comes off at checkout, no code needed.Launch offer: 50% off your first order

Engineer and Main Contractor

Request for information form and register

AED 79
Launch offerAED 39.50 on your first order, until 31 December.
Main ContractorEngineer
Clause
FIDIC 1999 Red BookSub-Clause 1.9
Time limit
Response period set in the communication protocol, commonly 7 to 14 days
Format
Excel, 4 sheetsLanguage: English, plus a full Arabic copy
Stage
Post-contract: 4. Build and monitorRoute: Both routes
Procurement routeApplies to the Employer, consultants and Main Contractor

The Employer designs through its consultant, tenders complete drawings and bills, and the contractor builds. FIDIC 1999 Red Book.

What this document does

  • Raises a question on drawings or specifications in a standard form and tracks every answer and its response time.
  • Sent by the Main Contractor to the Engineer.
  • Written to FIDIC 1999 Red Book, Sub-Clause 1.9.
  • Time limit: Response period set in the communication protocol, commonly 7 to 14 days.

What you get

Save with a pack

Main Contractor to Engineer: Build and monitor16 documents. Includes this document.
AED 1,126AED 729Save AED 397
How to write it

How to write a request for information (RFI)

An RFI asks the Engineer or the designer to clarify drawings or specifications that are unclear, missing or in conflict. A clear question with the right references gets a fast answer, and a register shows which answers are late.

What to include

  1. 1An RFI number, the date and the discipline
  2. 2The drawing, specification section or bill item, with revisions
  3. 3One clear question, with a sketch or photograph where it helps
  4. 4Your proposed solution, if you have one
  5. 5The date the answer is needed for the work, linked to the programme
  6. 6The likely effect on cost or time if the answer changes the work

When to use it

As soon as the problem is found, early enough for the answer to arrive before the work. The response period is set in the communication protocol, commonly 7 to 14 days.

Read the full guideHow to give notice of a delay
Sample wording
RFI 087, Structural. Drawing S-305 Rev B shows transfer beam TB-4 as 900 mm deep, while section 3 on drawing S-410 Rev A shows 750 mm. Please confirm the depth. The answer is needed by 18 June 2026 to keep the Level 4 slab pour on 25 June 2026.

Common mistakes

  • Several questions in one RFI, so the answer comes back partial
  • No date needed, so nobody knows it is urgent
  • Treating an RFI as a notice: when the answer affects time or cost, give the notice the contract requires separately

Questions people ask

Is an RFI a notice under the contract?

No. When a late answer will delay or disrupt the work, give the Engineer a separate notice under Sub-Clause 1.9 of the FIDIC 1999 Red Book, and a notice of claim under Sub-Clause 20.1 if it causes delay or cost.

Who answers an RFI?

The Engineer, usually with the designer’s input. Under a design and build contract, many RFIs go to the Contractor’s own designer.

Also used between