Shop drawing submittal and drawing log
Main ContractorEngineer
Clause
FIDIC 1999 Red BookSub-Clause 4.1
Time limit
Set by the agreement
Format
ExcelLanguage: English
Stage
Post-contract: 4. Build and monitorRoute: Both routes. Scope: Supply and install, Install only, Design, supply and install
What this document does
- Submits drawings for review with revision control and a log of status and comments.
- Sent by the Main Contractor to the Engineer.
- Written to FIDIC 1999 Red Book, Sub-Clause 4.1.
- Goes with: Submittal review sheet with status code
What you get
- Fillable form
- Log with status and ageing
- One-page guide on when and how to use it
- File: Excel
- Language: English