Engineer and Main Contractor

Statement at completion

AED 99
Launch offerAED 49.50 on your first order, until 31 December.
Main ContractorEngineer
Clause
FIDIC 1999 Red BookSub-Clause 14.10
Time limit
Within 84 days of the Taking-Over Certificate
Format
Excel, 7 sheetsLanguage: English, plus a full Arabic copy
Stage
Post-contract: 6. PaymentsRoute: Both routes
Procurement routeApplies to the Employer, consultants and Main Contractor

The Employer designs through its consultant, tenders complete drawings and bills, and the contractor builds. FIDIC 1999 Red Book.

What this document does

  • Value of all work done, further sums considered due and an estimate of amounts still to come.
  • Sent by the Main Contractor to the Engineer.
  • Written to FIDIC 1999 Red Book, Sub-Clause 14.10.
  • Time limit: Within 84 days of the Taking-Over Certificate.
  • Step 8 of 9 in the Payment process.

What you get

Save with a pack

Main Contractor to Engineer: Payments6 documents. Includes this document.
AED 594AED 389Save AED 205
Payment process: Main Contractor steps5 documents. Includes this document.
AED 535AED 369Save AED 166