Engineer and Main Contractor

Variation register with estimates and approved values

AED 149
Launch offerAED 74.50 on your first order, until 31 December.
EngineerEngineerinternal
Clause
FIDIC 1999 Red BookSub-Clause 13
Time limit
Set by the agreement
Format
Excel, 3 sheetsLanguage: English, plus a full Arabic copy
Stage
Post-contract: 5. Changes and claimsRoute: Both routes
Procurement routeApplies to the Employer, consultants and Main Contractor

The Employer designs through its consultant, tenders complete drawings and bills, and the contractor builds. FIDIC 1999 Red Book.

What this document does

  • Every potential and instructed variation with rough order estimate, proposal, recommended and approved values and status.
  • Kept by the Engineer as its own record.
  • Written to FIDIC 1999 Red Book, Sub-Clause 13.
  • Step 6 of 10 in the Variation process.

What you get

Save with a pack

Engineer to Main Contractor: Changes and claims6 documents. Includes this document.
AED 454AED 299Save AED 155
Variation process: Supervision Consultant steps4 documents. Includes this document.
AED 346AED 239Save AED 107
How to write it

How to keep a variation register

The variation register tracks every change to the contract, from the day it is raised to its approved value. It shows your estimate, the contractor’s proposal, the Engineer’s recommendation and the approved value side by side, so you can see the forecast final cost and the allowance left at any time.

What to include

  1. 1A number, title, reason and date raised for every variation
  2. 2Who raised it, and the instruction or request it came from
  3. 3Your estimate, the contractor’s proposal and the Engineer’s recommendation
  4. 4The approved value, the variation order number and its date
  5. 5The status: potential, proposal requested, instructed, approved, rejected or withdrawn
  6. 6The effect on time, where an extension is claimed
  7. 7The forecast total, and the allowance left in the budget

When to use it

From the start of the contract to the final account. Log each variation on the day it is raised, before a proposal is asked for, and update it every time a proposal, a recommendation or an approval arrives.

Read the full guideVariations in construction: request, proposal and variation order
Sample wording
VO-017, extra power outlets in the retail units, raised by the Employer on 14 April 2026. Estimate AED 182,000; proposal AED 236,500; Engineer’s recommendation AED 198,750; approved at AED 198,750 on 20 May 2026. No extension of time claimed.

Common mistakes

  • Logging a variation only once it is approved
  • Counting open items at zero in the forecast
  • Leaving old items open: work started without approval becomes a claim

Questions people ask

How should open variations count in the forecast?

At the best figure you have: the Engineer’s recommendation, or else your estimate, or else the contractor’s proposal. Rejected and withdrawn items count as nothing.

Does the Engineer need the Employer’s approval to instruct?

Only if the Particular Conditions say so (Sub-Clause 3.1). Many UAE contracts set a value above which the Employer must approve first, so record that approval with the variation.

Where it sits in the processes

Variation, step 6 of 10View all