Engineer and Main Contractor

Contractor’s Documents submission schedule

Main ContractorEngineer
Clause
FIDIC 1999 Yellow BookSub-Clause 5.2
Time limit
Set by the agreement
Format
ExcelLanguage: English
Stage
Post-contract: 3. Sign and startRoute: Design and Build

What this document does

  • Every design document to be submitted for review, with planned dates and the 21-day review window.
  • Sent by the Main Contractor to the Engineer.
  • Written to FIDIC 1999 Yellow Book, Sub-Clause 5.2.
  • Step 3 of 8 in the Design submissions under Design and Build process.
  • For Design and Build projects only.