Engineer and Main Contractor

Designer’s compliance certificate for construction issue (Design and Build)

Main ContractorEngineer
Clause
FIDIC 1999 Yellow BookSub-Clause 5.2
Time limit
Set by the agreement
Format
WordLanguage: English
Stage
Post-contract: 4. Build and monitorRoute: Design and Build

What this document does

  • The contractor’s designer certifies that the construction issue complies with the Employer’s Requirements, the reviewed documents and the authority approvals.
  • Sent by the Main Contractor to the Engineer.
  • Written to FIDIC 1999 Yellow Book, Sub-Clause 5.2.
  • Step 8 of 8 in the Design submissions under Design and Build process.
  • For Design and Build projects only.

What you get

Where it sits in the processes

Design submissions under Design and Build, step 8 of 8View all
BeforeEmployer’s Requirements compliance matrix
This documentDesigner’s compliance certificate for construction issue (Design and Build)
End of the process