Employer and Main Contractor
AED 1,238AED 799Save AED 439
AED 464AED 319Save AED 145
Employer’s Requirements compliance matrix
AED 79
Launch offerAED 39.50 on your first order, until 31 December.
Main ContractorEmployer
Clause
FIDIC 1999 Yellow BookSub-Clause 5.1
Time limit
Set by the agreement
Format
Excel, 3 sheetsLanguage: English, plus a full Arabic copy
Stage
Pre-contract: 1. TenderRoute: Design and Build
What this document does
- Requirement by requirement, how the proposal or the design meets it, with deviations flagged for acceptance.
- Sent by the Main Contractor to the Employer.
- Written to FIDIC 1999 Yellow Book, Sub-Clause 5.1.
- Step 7 of 8 in the Design submissions under Design and Build process.
- For Design and Build projects only.
What you get
- Excel schedules and summary sheet
- One-page guide on when and how to use it
- A full Arabic copy of every file, right to left
- File: Excel, 3 sheets
- Language: English, plus a full Arabic copy
- Brand-ready: your logo and company details go in when you download
- Pay once and use it on every project
Save with a pack
Main Contractor to Employer: Tender12 documents. Includes this document.
Design submissions under Design and Build process: Main Contractor steps6 documents. Includes this document.
Where it sits in the processes
Design submissions under Design and Build, step 7 of 8View all
BeforeDesign change control form
This documentEmployer’s Requirements compliance matrix
AfterDesigner’s compliance certificate for construction issue (Design and Build)