Launch offer: 50% off your first order until 31 December. It comes off at checkout, no code needed.Launch offer: 50% off your first order

Engineer and Main Contractor

Review notice and no-objection letter

AED 59
Launch offerAED 29.50 on your first order, until 31 December.
EngineerMain Contractor
Clause
FIDIC 1999 Yellow BookSub-Clause 5.2
Time limit
Within the 21-day review period; with no notice, the document is deemed approved
Format
Word, 3 pagesEnglish and Arabic copy, 3 pages
Stage
Post-contract: 4. Build and monitorRoute: Design and Build

What this document does

  • The Engineer’s notice of no objection, or of the respects in which the document fails to comply, without relieving the contractor of responsibility.
  • Sent by the Engineer to the Main Contractor.
  • Written to FIDIC 1999 Yellow Book, Sub-Clause 5.2.
  • Time limit: Within the 21-day review period; with no notice, the document is deemed approved.
  • Goes with: Contractor’s Documents submission (design submission)
  • Step 5 of 8 in the Design submissions under Design and Build process.
  • For Design and Build projects only.

What you get

Save with a pack

Engineer to Main Contractor: Build and monitor9 documents. Includes this document.
AED 413AED 269Save AED 144

Where it sits in the processes

Design submissions under Design and Build, step 5 of 8View all