Engineer and Main Contractor
Review notice and no-objection letter
EngineerMain Contractor
Clause
FIDIC 1999 Yellow BookSub-Clause 5.2
Time limit
Within the 21-day review period; with no notice, the document is deemed approved
Format
WordLanguage: English and Arabic
Stage
Post-contract: 4. Build and monitorRoute: Design and Build
What this document does
- The Engineer’s notice of no objection, or of the respects in which the document fails to comply, without relieving the contractor of responsibility.
- Sent by the Engineer to the Main Contractor.
- Written to FIDIC 1999 Yellow Book, Sub-Clause 5.2.
- Time limit: Within the 21-day review period; with no notice, the document is deemed approved.
- Goes with: Contractor’s Documents submission (design submission)
- Step 5 of 8 in the Design submissions under Design and Build process.
- For Design and Build projects only.
What you get
- Editable Word template
- English and Arabic text side by side
- One-page guide on when and how to use it
- File: Word
- Language: English and Arabic
- Brand-ready: your logo and company details go in when you download
- Pay once and use it on every project
Where it sits in the processes
Design submissions under Design and Build, step 5 of 8View all
BeforeContractor’s Documents submission (design submission)
This documentReview notice and no-objection letter
AfterDesign change control form