Engineer and Main Contractor
AED 772AED 499Save AED 273
AED 464AED 319Save AED 145
Design change control form
AED 59
Launch offerAED 29.50 on your first order, until 31 December.
Main ContractorEngineer
Clause
FIDIC 1999 Yellow BookSub-Clause 13.1
Time limit
Set by the agreement
Format
Word, 5 pagesLanguage: English, plus a full Arabic copy
Stage
Post-contract: 5. Changes and claimsRoute: Design and Build
What this document does
- Records a change to a reviewed design document, whether it is a variation or the contractor’s own development, and the resubmission.
- Sent by the Main Contractor to the Engineer.
- Written to FIDIC 1999 Yellow Book, Sub-Clause 13.1.
- Step 6 of 8 in the Design submissions under Design and Build process.
- For Design and Build projects only.
What you get
- Fillable form
- Register sheet
- One-page guide on when and how to use it
- A full Arabic copy of every file, right to left
- File: Word, 5 pages
- Language: English, plus a full Arabic copy
- Brand-ready: your logo and company details go in when you download
- Pay once and use it on every project
Save with a pack
Main Contractor to Engineer: Changes and claims8 documents. Includes this document.
Design submissions under Design and Build process: Main Contractor steps6 documents. Includes this document.
Where it sits in the processes
Design submissions under Design and Build, step 6 of 8View all
BeforeReview notice and no-objection letter
This documentDesign change control form
AfterEmployer’s Requirements compliance matrix