Engineer and Main Contractor
Contractor’s Documents submission (design submission)
Main ContractorEngineer
Clause
FIDIC 1999 Yellow BookSub-Clause 5.2
Time limit
Review period of 21 days from receipt
Format
Word and ExcelLanguage: English
Stage
Post-contract: 4. Build and monitorRoute: Design and Build
What this document does
- Transmittal, drawing and calculation list, compliance statement and the designer’s certificate for each design package.
- Sent by the Main Contractor to the Engineer.
- Written to FIDIC 1999 Yellow Book, Sub-Clause 5.2.
- Time limit: Review period of 21 days from receipt.
- Goes with: Review notice and no-objection letter
- Step 4 of 8 in the Design submissions under Design and Build process.
- For Design and Build projects only.
What you get
- Fillable form
- Checklist of attachments
- One-page guide on when and how to use it
- File: Word and Excel
- Language: English
- Brand-ready: your logo and company details go in when you download
- Pay once and use it on every project
Where it sits in the processes
Design submissions under Design and Build, step 4 of 8View all
BeforeContractor’s Documents submission schedule
This documentContractor’s Documents submission (design submission)
AfterReview notice and no-objection letter