Contractor’s Documents submission (design submission)

AED 99
Launch offerAED 49.50 on your first order, until 31 December.
Main ContractorEngineer
Clause
FIDIC 1999 Yellow BookSub-Clause 5.2
Time limit
Review period of 21 days from receipt
Format
Word, 5 pagesExcel, 4 sheetsLanguage: English, plus a full Arabic copy
Stage
Post-contract: 4. Build and monitorRoute: Design and Build

What this document does

  • Transmittal, drawing and calculation list, compliance statement and the designer’s certificate for each design package.
  • Sent by the Main Contractor to the Engineer.
  • Written to FIDIC 1999 Yellow Book, Sub-Clause 5.2.
  • Time limit: Review period of 21 days from receipt.
  • Goes with: Review notice and no-objection letter
  • Step 4 of 8 in the Design submissions under Design and Build process.
  • For Design and Build projects only.

What you get

Save with a pack

Main Contractor to Engineer: Build and monitor19 documents. Includes this document.
AED 1,353AED 879Save AED 474
Design submissions under Design and Build process: Main Contractor steps6 documents. Includes this document.
AED 464AED 319Save AED 145

Where it sits in the processes

Design submissions under Design and Build, step 4 of 8View all
BeforeContractor’s Documents submission schedule
This documentContractor’s Documents submission (design submission)
AfterReview notice and no-objection letter