Engineer and Main Contractor

Contractor’s Documents submission (design submission)

Main ContractorEngineer
Clause
FIDIC 1999 Yellow BookSub-Clause 5.2
Time limit
Review period of 21 days from receipt
Format
Word and ExcelLanguage: English
Stage
Post-contract: 4. Build and monitorRoute: Design and Build

What this document does

  • Transmittal, drawing and calculation list, compliance statement and the designer’s certificate for each design package.
  • Sent by the Main Contractor to the Engineer.
  • Written to FIDIC 1999 Yellow Book, Sub-Clause 5.2.
  • Time limit: Review period of 21 days from receipt.
  • Goes with: Review notice and no-objection letter
  • Step 4 of 8 in the Design submissions under Design and Build process.
  • For Design and Build projects only.

What you get

Where it sits in the processes

Design submissions under Design and Build, step 4 of 8View all
BeforeContractor’s Documents submission schedule
This documentContractor’s Documents submission (design submission)
AfterReview notice and no-objection letter