Engineer and Main Contractor
AED 1,353AED 879Save AED 474
AED 464AED 319Save AED 145
Contractor’s Documents submission (design submission)
AED 99
Launch offerAED 49.50 on your first order, until 31 December.
Main ContractorEngineer
Clause
FIDIC 1999 Yellow BookSub-Clause 5.2
Time limit
Review period of 21 days from receipt
Format
Word, 5 pagesExcel, 4 sheetsLanguage: English, plus a full Arabic copy
Stage
Post-contract: 4. Build and monitorRoute: Design and Build
What this document does
- Transmittal, drawing and calculation list, compliance statement and the designer’s certificate for each design package.
- Sent by the Main Contractor to the Engineer.
- Written to FIDIC 1999 Yellow Book, Sub-Clause 5.2.
- Time limit: Review period of 21 days from receipt.
- Goes with: Review notice and no-objection letter
- Step 4 of 8 in the Design submissions under Design and Build process.
- For Design and Build projects only.
What you get
- Fillable form
- Checklist of attachments
- One-page guide on when and how to use it
- A full Arabic copy of every file, right to left
- File: Word, 5 pages
- File: Excel, 4 sheets
- Language: English, plus a full Arabic copy
- Brand-ready: your logo and company details go in when you download
- Pay once and use it on every project
Save with a pack
Main Contractor to Engineer: Build and monitor19 documents. Includes this document.
Design submissions under Design and Build process: Main Contractor steps6 documents. Includes this document.
Where it sits in the processes
Design submissions under Design and Build, step 4 of 8View all
BeforeContractor’s Documents submission schedule
This documentContractor’s Documents submission (design submission)
AfterReview notice and no-objection letter