Launch offer: 50% off your first order until 31 December. It comes off at checkout, no code needed.Launch offer: 50% off your first order

Engineer and Main Contractor

Civil Defence inspection and completion certificate checklist

AED 79
Launch offerAED 39.50 on your first order, until 31 December.
Main ContractorEngineer
Clause
UAE practice
Time limit
Set by the agreement
Format
Word, 9 pagesExcel, 4 sheetsLanguage: English, plus a full Arabic copy
Stage
Post-contract: 7. Handover and closeRoute: Both routes
Procurement routeApplies to the Employer, consultants and Main Contractor

The Employer designs through its consultant, tenders complete drawings and bills, and the contractor builds. FIDIC 1999 Red Book.

What this document does

What you get

Save with a pack

Main Contractor to Engineer: Handover and close9 documents. Includes this document.
AED 622AED 399Save AED 223
Handover, defects and close-out process: Main Contractor steps6 documents. Includes this document.
AED 495AED 349Save AED 146

Where it sits in the processes

Handover, defects and close-out, step 4 of 14View all
BeforeTesting and commissioning method statement and report
This documentCivil Defence inspection and completion certificate checklist
AfterRequest for taking-over certificate
Fit-out approvals and handover, step 13 of 17View all
BeforeInspection request and log
This documentCivil Defence inspection and completion certificate checklist
AfterFinal fit-out inspection and deposit refund request

Also used between