Engineer and Main Contractor
AED 622AED 399Save AED 223
AED 495AED 349Save AED 146
Civil Defence inspection and completion certificate checklist
AED 79
Launch offerAED 39.50 on your first order, until 31 December.
Main ContractorEngineer
Clause
UAE practice
Time limit
Set by the agreement
Format
Word, 9 pagesExcel, 4 sheetsLanguage: English, plus a full Arabic copy
Stage
Post-contract: 7. Handover and closeRoute: Both routes
What this document does
- Inspection request letters and the document set each authority requires before the building completion certificate.
- Sent by the Main Contractor to the Engineer.
- Written to UAE practice.
- Step 4 of 14 in the Handover, defects and close-out process.
- Step 13 of 17 in the Fit-out approvals and handover process.
What you get
- Editable Word template
- Checklist of attachments
- One-page guide on when and how to use it
- A full Arabic copy of every file, right to left
- File: Word, 9 pages
- File: Excel, 4 sheets
- Language: English, plus a full Arabic copy
- Brand-ready: your logo and company details go in when you download
- Pay once and use it on every project
Save with a pack
Main Contractor to Engineer: Handover and close9 documents. Includes this document.
Handover, defects and close-out process: Main Contractor steps6 documents. Includes this document.
Where it sits in the processes
Handover, defects and close-out, step 4 of 14View all
BeforeTesting and commissioning method statement and report
This documentCivil Defence inspection and completion certificate checklist
AfterRequest for taking-over certificateFit-out approvals and handover, step 13 of 17View all
BeforeInspection request and log
This documentCivil Defence inspection and completion certificate checklist
AfterFinal fit-out inspection and deposit refund request