Design submissions under Design and Build

The contractor’s designer produces, the contractor submits, the Engineer reviews within 21 days and gives or withholds a no-objection.

Show steps for
8 steps in this process
Design ConsultantSupervision ConsultantMain ContractorContractor’s design brief to its designerContractor’s designbrief to its designer1Designer deliverables schedule and review logDesigner deliverablesschedule and reviewlog2Contractor’s Documents submission scheduleContractor’sDocuments submissionschedule3Contractor’s Documents submission (design submission)Contractor’sDocuments submission(design submission)4Review notice and no-objection letterReview notice andno-objection letter5Design change control formDesign change controlform6Employer’s Requirements compliance matrixEmployer’sRequirementscompliance matrix7Designer’s compliance certificate for construction issue (Design and Build)Designer’s compliancecertificate forconstruction…8
1Contractor’s design brief to its designer
Main ContractorDesign Consultant
YB 5.1
AED 99
2Designer deliverables schedule and review log
Design ConsultantMain Contractor
YB 5.2
AED 59
3Contractor’s Documents submission schedule
Main ContractorEngineer
YB 5.2
AED 79
4Contractor’s Documents submission (design submission)
Main ContractorEngineer
YB 5.2 Review period of 21 days from receipt
AED 99
5Review notice and no-objection letter
EngineerMain Contractor
YB 5.2 Within the 21-day review period; with no notice, the document is deemed approved
AED 59
6Design change control form
Main ContractorEngineer
YB 13.1
AED 59
7Employer’s Requirements compliance matrix
Main ContractorEngineer
YB 5.1
AED 79

All steps: Design submissions under Design and Build process

8 documents in this pack. 40% less than one by one.